United States
S. 3736
Dakota Mainstem Water Supply Project Feasibility Study Act
The bill would require the Secretary of the Interior to study whether it's feasible to build a water supply project that would deliver municipal, rural, and industrial water to a regional water system serving parts of South Dakota, Iowa, Nebraska, and Minnesota.[AI-Generated]
Reported by committee 17 September 2026
Record as of 17 September 2026 — the most recent action in the official record. Status can lag; each step below carries its own date.
- 17 September 2026 Reported by committee
What's next: Floor scheduling (leadership decides if and when it gets a vote)
- 17 September 2026 Placed on calendar (Senate)
2 more actions
- 10 June 2026 Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.
- 17 March 2026 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.
- 29 January 2026 Referred to committee
- 29 January 2026 Introduced in Senate
This path starts where the bill does — its first action in the official record. Routine procedural steps sit in the “more actions” rows above rather than on the main line.
Read the live feed — on the site or in the app Look up S. 3736 on Congress.gov All US bills