Back to the feed

EU tracker

2025/0399(COD)

Posted 10 September 2026

Trans-European energy infrastructure: guidelines

ITRE · Tsvetelina Penkova (S&D)

10 September 2026  |  Negotiating mandate for trilogue talks

What's next: Trilogue talks with the Council can begin once the Council side has its own mandate. Closed-door rounds follow; timing is not published.

Summary: This proposal aims to establish guidelines for energy infrastructure projects across Europe to improve connectivity and energy supply between member states. It seeks to coordinate the planning and development of major energy networks, such as pipelines and electricity lines, to strengthen Europe's energy security and integration.

[AI-Generated]

Sign in to vote or follow

As published — the exact text this tracker posted, kept verbatim for the record
2025/0399(COD) | European Energy Networks Rapporteur: Tsvetelina Penkova (S&D) | Lead committee: ITRE 📅 10 September 2026 | 🧭 Negotiating mandate for trilogue talks What's next: Trilogue talks with the Council can begin once the Council side has its own mandate. Closed-door rounds follow; timing is not published. Summary: This proposal aims to establish guidelines for energy infrastructure projects across Europe to improve connectivity and energy supply between member states. It seeks to coordinate the planning and development of major energy networks, such as pipelines and electricity lines, to strengthen Europe's energy security and integration. [AI-Generated] Source: OEIL procedure file 2025/0399(COD)

Look it up on OEIL See the full path of 2025/0399(COD)

A permanent record of a post published by BillTracking's EU tracker. The facts are drawn from the official record; the reference above is the lookup key on OEIL. Spotted an error? accuracy@billtracking.org.